Plastic Dustbins Mould

Plastic Dustbins Mould

For this plastic waste bin mold, we adhere to the "people-oriented, continuous innovation" concept, implement the principle of "pursuing excellence, manufacturing quality products", and follow tenants "pay attention to every detail."
In order to make the cavity smooth, the surface of the Plastic Dustbins Mould should be polished to the mirror surface with a surface roughness of less than Ra of 0.4 μm to ensure the appearance and easy release.

Product Details

Description

For this plastic waste bin mold, we adhere to the "people-oriented, continuous innovation" concept, implement the principle of "pursuing excellence, manufacturing quality products", and follow tenants "pay attention to every detail." 

With the advent of high-speed molding machines, plastic products run faster. Since the molding temperature is between 200 ° C and 350 ° C, if the plastic has poor fluidity and rapid prototyping, the temperature of the partially formed surface may exceed 400 ° C in a short time. To ensure accuracy and micro-deformation, the mold steel should have high heat resistance. So we usually use P20 as the material. High-tech machining is to ensure its mirror-like characteristics. In order to make the cavity smooth, the surface of the Plastic Dustbins Mould should be polished to the mirror surface with a surface roughness of less than Ra of 0.4 μm to ensure the appearance and easy release.

Parameter

Product Name

large plastic trash can molds factory

Core &Cavity Steel

P20,718H,2738H, H13, NAK80,2316 etc.

Mould base & Standard Component

DME,HASCO,Self-made etc.

Steel hardness:

HRC35-38

Plastic material

PP,PC,PE,ABS,PVC etc.

Cavity Number

1*1

Injection System

Side Gate,hot gate

Ejector System

Ejector Pin

Cycle Time

30-60S

Tooling lead time

45-60 Days

Mould life

500,000 Shots

MAIN QC PROCEDURE

1. Mould Steel Hardness、Dimension Inspection

2. Mould Electrodes Inspection

3. Mould Parts Dimension Inspection

4. Mould Pre-Assembly Inspection

5. Mould Trial Report and Samples Inspection

6. Mould Shipment Final Inspection

Inquiry